explicitClick to confirm you are 18+

Procedure for Septic Tank Installation

excavatingservicesprosguideAug 7, 2018, 4:13:20 AM
repeatthumb_upthumb_down



If the condition of the soil in your home is not the ideal one, then installing a septic system will really be challenging. This is a challenge for those who have waterfront properties. The soil on these properties are moist so the system may not be as efficient in treating the wastewater, and harmful bacteria may enter your system. It is very important that you understand what you are doing when installing a septic system. You should hire the Anoka septic installation service of a licensed professional to do the installation for you.

First of all, you will need to acquire permit and guidelines from the authorities in order to install a septic system. You need to have the right sized tank. The size is determined by the number of persons in the household. If you need to measure the size of the tank for your property, you need to seek the help of a home inspector.

Next, you decide on what type of tank you want. The most common choice is concrete. Today, however, plastic tanks are becoming very popular. Plastic tanks are lighter and they are more durable and easier to handle compared to concrete ones.

You then need to determine where to place your tank. The best person to be able to measure that distance required from your home, property lines, etc., is a home inspector. You also need to have a field bed. The filtering of wastewater is done in the field bed. You should have a field bad as large as your septic tank. It is important that proper soil or sand is on your field bed. You need to get the proper construction permits so that your efforts will not be wasted.

You should hire Anoka excavation contractor professionals to come to your property to dig the hole for the septic tank. The septic tank is then lowered into the dug hole. In order for the septic to be level, shovel bits of rock or gravel in so that the base is firm in place. The inspector will establish the specifications for digging the field bed.

Your home plumbing system should be connected to the septic tank with PVC pipes laid out. Tight connects will prevent the pipes from leaking. After the system is connected and fully sealed, test for leaks by flushing the toilet.

Even if you will cover your septic tank and pipes with soil, there has to be an uncovered hatch so that there is access for water and maintenance. Then fill the tank with water according to the septic tank manufacturer's instructions. To prevent from bursting, the septic tank should not be full.

Make sure you let people with experience to install the septic tank. Professional installation should be done for your septic tank.